INSTALLATION - 6 easy stages
STAGE 1
Obtain council
approval.
STAGE 2
Excavate, prepare
and level base.
STAGE 3
Crane pool
into position.
STAGE 4
Connect
plumbing.
STAGE 5
Backfill, pour bond beam
lay paving, surrounds.
STAGE 6
Finished pool ready
for your first swim !
Your agent and installer will submit a layout plan and obtain council approval.
The hole is carefully excavated, the base prepared and levelled.
Pool is lowered into position. Even tight and difficult access is not a problem.
Pool is accurately positioned, and plumbing connected.
A concrete reinforced bond beam is poured around the pool to lock it firmly in place, and to provide a surface for laying the paver surround.
Final paving, landscaping, fencing. Pool is then commissioned and you’re ready to go !